Linde N20, N24 Order Picker 132 Series Operating Instructions (User Manual)
Linde N20, N24 Order Picker 132 Series Operating Instructions (User Manual)
Original Illustrated Factory Operating Instructions (User Manual) for Linde Order Picker Series 132, Models N20, N24.
Original factory manuals for Linde Forklift Trucks, contains high quality images, circuit diagrams and instructions to help you to operate and repair your truck
Covered models: N20 N24
Format: PDF, 142 Pages Language: English
Contents: 1. Introduction Your truck Impermissible use Description of use and climatic conditions Specific use of equipment Symbols used Legal requirements for marketing Order picker N20 - N24 type 132 2. Safety Residual risks Stability Operation of industrial trucks in plant area Safety regulations Handling consumables 3. General views Labels General view N20 - N24 type 132 (chassis with 4-point support) General view N20 - N24 type 132 (chassis with 5-point support) Controls N20 - N24 Multi-function display Multifunction display settings Biometry option 4. Operation Setup Checks before first use Daily checks before use Operating instructions for the N20 - N24 Start-up Emergency stop button Identifyingthe direction of travel Forward travel / reverse travel Reversing the direction of travel Steering Safety when turning: speed limitation Turning stability Safety when reversing; speed limitation (N20 fitted with a fixed stabiliser wheel only) Operation in ride-on mode Pedestrian controlled mode Using the truck on a slope Braking, lifting, lowering, horn Load handling Lifting, towing 5. Maintenance Summary of checks and maintenance jobs Maintenance Calendar of testing and maintenance operations Technical inspection and maintenance characteristics Recommended lubricants . . Daily checks before starting work Checking the direction of travel controls Checking the brakes Checking the lift /lower controls Checking the electric steering Checking the safety devices Checking the battery chargestatus Opening the battery cover . . Plugging in / unplugging the battery connector Checking the condition of cables,terminals and battery connector Batterychargingwithanexternalcharger Batteryforverticalremoval:removing/replacing Side access battery;unlocking/locking the battery Battery for side removal: changing using a roller unit Side loading battery; changing the battery with a trolley Maintenance plan as required Cleaning the truck Cleaning the battery and its compartment Access to the technical compartment Checking the fuses Seat:checking the condition Handle bar: checking the condition Side access battery; selection ofbattery compartment opening side Lifting system, lubricating the collarsand links(version with grease nipples) Inspection and maintenance overview 1000hServiceplan 2000hServiceplan Traction motor Traction motor: cleaning the cooling fins . . Gearbox Transmission: checking the oil level in the reducer Transmission: draining the reducer Steering / wheels / braking Checking the condition and tightness of the wheels Fixed stabiliser, stabiliser wheel height adjustment Steering: checking the gear motor drive pinion/turntable Electromagnetic brake: adjusting the air gap Electromagnetic brake, checkingthe booster circuit for leaks Electrical equipment Handling the electrical plate Workingplatform,checkingtightness Electrical equipment: cleaning the electrical panel and checking the connections Electrical equipment, checking the control modules LAC, LES and their connections Testing and cleaning the fan Servicing the battery Electrical equipment, checking the condition of the cable attachments and electrical connections Hydraulic circuits Main hydraulic circuit Checking and if necessary replacing the main motor pump brushes (N24 only) N20-N24 with servos tabilisers Primary hydraulic circuit N20 - N24 with stabiliser wheel drives Lifting system Lifting system 6. Technical specification Specifications for N20 / N24 type 132
Annex 7. Diagrams Main hydraulic diagram Hydraulic diagram for stabilisers Power circuit diagram Electrical control schematic N20 - N24, (4 point) Electrical control schematic N20 - N24, (5 point)